← All twelve plants
The record
Mulin Technology Vietnam Co., Ltd越南慕林科技責任有限公司
- Industry
- Machinery
- Located in
- Tan Tien 2 industrial cluster
- Province
- Binh Phuoc
- Build time
- 6 months
- Land area
- 17,175.6 m²
- Built footprint
- 11,118 m²
- Floor area
- 32,768.8 m²
- Buildings in scope
- 2
Building schedule
| Item | Storeys | Footprint m² | Floor area m² |
|---|---|---|---|
| Workshop 廠房 | 3 | 9,576 | 28,728 |
| Administration and service land 行政-服務工程建設用地 | — | 1,420 | 4,040.8 |
The rows printed on this schedule do not add to the totals printed above them. Both are reproduced exactly as the profile prints them; the discrepancy is in the source. Difference, footprint and floor area: -122 m² / +0 m².
3D study




Ground breaking




On site











Record as printed in the capability profile of 3 September 2026.
Next step
Send the brief, get a programme back.
What you will manufacture, the built area you need, and the month you want production to start.
Open the record