After years of study and planning, Ho Chi Minh City is steadily turning its goal of building a modern urban transport network into reality. The metro lines that will weave across the city are now being pushed forward in earnest.
On this page
The HCMC Urban Railway Management Authority (MAUR) has recently proposed building two metro lines connecting Ho Chi Minh City and Binh Duong, with a total investment of roughly KRW 10 trillion (about VND 100 trillion).
According to Dang Tran, a technical expert at the metro-focused platform 'Tau Metro,' this is more than an infrastructure project — it is a strategic initiative to promote balanced regional development. At the same time, it is seen as a crucial turning point opening a future in which millions of residents can move between the two key regions faster, more conveniently and more smartly.

Two metro lines linking Ho Chi Minh City and Binh Duong
🚇 Development plan: HCMC–Binh Duong metro connection
🔹 Metro Line 1 extension
(New Binh Duong city center → Suoi Tien, Thu Duc city)
Line length: about 29 km
Number of stations: 17
Depot: Long Binh Depot (shared with the existing Metro Line 1)
Total investment: about VND 46,725 billion
🔹 New Line 2
(Thu Dau Mot → Vinh Phu, Thuan An → connecting to HCMC Metro Line 3)
Line length: about 21.9 km
Number of stations: 13
Depot: Hiep Binh Phuoc Depot (shared with Metro Line 3)
Total investment: approximately VND 5,000 – 5,300 billion
🚇 HCMC – Binh Duong metro lines at a glance
| Line | Segment (Origin–Destination) — Length — No. of stations — Depot — Total investment (VND) |
| Metro Line 1 extension | Binh Duong New City center → Suoi Tien (Thu Duc) — approx. 29 km — 17 — Long Binh Depot (shared with Line 1) — 4.6725 trillion VND |
| Metro Line 2 | Thu Dau Mot (former Phu My) → Vinh Phu (Thuan An) → Hiep Binh Phuoc (connection to Line 3) — approx. 21.9 km — 13 — Hiep Binh Phuoc Depot (shared with Line 3) — approx. 5.0425–5.3 trillion VND |
📑 Legal basis and progress
🔹 The Metro Line 1 extension has completed review by the National Appraisal Council, and Ho Chi Minh City is now preparing for Government and National Assembly approvals.
🔹 Metro Line 2 in the Binh Duong section
Pre-feasibility study report was completed as of end-June 2025. In particular, with the new Investment Law and Urban Railway Law granting provincial governments (provincial People's Committees) decision-making authority on investment policy, project preparation time is expected to be significantly shortened.
Ho Chi Minh City has already allocated an initial budget of at least VND 10 billion for each line, kicking off project-preparation work within the 2021–2025 medium-term public-investment plan.

🌆 Regional connectivity — a catalyst for new-town growth
Developing these two metro lines goes beyond investing in transport infrastructure — it is a symbolic project declaring a regional-development strategy built on connectivity.
These lines will become a core axis of the TOD (Transit-Oriented Development) model — that is, they will form an urban structure in which residential, commercial, service and cultural functions grow together, anchored on public-transport infrastructure.
At a time when urban expansion and integration between Ho Chi Minh City and Binh Duong Province are accelerating, these two metro lines will be more than a physical link — they will form a strategic connector driving sustainable, smart urban development.
With total investment of about KRW 10 trillion, this project — building an elevated metro between Ho Chi Minh City and Binh Duong — sends a clear message about the city's future, far beyond simply improving transit.
👉 The future of regional connectivity
👉 The foundation for green-city growth
👉 Realizing a new lifestyle of 'a city where everything you need is close by'
This project, in short, is a powerful commitment from the city to that very future.
Want a deeper market briefing?
Our research desk publishes a 40-page quarterly Vietnam Real Estate Brief. Free for qualified investors.
Request the briefMore articles
All news
Property Sale/ResaleNorton Park 價格與付款方案(2026):胡志明市 Lai Thieu 新建案、交屋時程與外國人購買
根據 adongland.vn 於 2026 年發布的市場資料,Gamuda Land 旗下位於 Ho Chi Minh(胡志明市) Lai Thieu…
Read article
Property Sale/ResaleGladia Heights Price & Payment Plan (2026): Keppel x Khang Dien Thu Duc City TWD per Ping & Handover Schedule
According to the developer's official price list as of June 2026, Gladia Heights prices are estimated to average 83 million to 91 million per square meter...
Read article
Property Sale/Resale하노이 5개 메트로 노선과 28개 우선 역사 위치 공개 및 역세권 단지 분석
하노이 당국이 총연장 약 293km의 5개 메트로 노선과 28개 우선 역사 위치를 공개함에 따라 외국인 매수자를 위한 역세권 정보를…
Read articleThe essentials every foreign buyer should read before reserving.

