
← All twelve plants
The record
Hongting Technology (Vietnam) Co., Ltd弘廷科技(越南)有限責任公司
- Industry
- Electronic components
- Located in
- VSIP III industrial park
- Province
- Ho Chi Minh City
- Build time
- 9 months
- Land area
- 25,050 m²
- Built footprint
- 13,837 m²
- Floor area
- 55,801 m²
- Buildings in scope
- 7
Building schedule
| Item | Storeys | Footprint m² | Floor area m² |
|---|---|---|---|
| Office and workshop 辦公樓+車間 | 6 | 11,296 | 46,917 |
| Mixed-use block 綜合室 | 5 | 1,512 | 7,560 |
| Connecting corridor 連接走廊 | 2 | 55 | 110 |
| Guard house and generator base 保安室+發電機混凝土基礎 | 1 | 32 | 32 |
| Fire duty room 消防值班室 | 1 | 24 | 24 |
| Pump house and fire tank, underground 泵房+消防水池(地下) | — | — | 240 |
| Ancillary works 輔助區域 | 1 | 918 | 918 |
3D study





Ground breaking




On site







Record as printed in the capability profile of 3 September 2026.
Next step
Send the brief, get a programme back.
What you will manufacture, the built area you need, and the month you want production to start.
Open the record